An overview of the funding scheme
The Federal Ministry of Transport (BMV) is funding the expansion of charging infrastructure in multi-occupancy buildings. Support is provided for the purchase and installation of charging points that are not accessible to the public. Charging facilities should be available where people live. SWK Stadtwerke Kaiserslautern is the local energy partner responsible for implementation.
What is funded, and to what extent?
Up to €1,300 per pitch
Pre-cabling
Technical equipment, mains connection and necessary building works – excluding the wallbox.
Up to €1,500 per parking space
Wallbox (AC)
In addition to the pre-wiring, a wallbox with a maximum charging power of 22 kW.
Up to €2,000 per parking space
Bidirectional wallbox
Wallbox with bidirectional charging capability.
Who is eligible for the grant?
| Owners’ associations (WEG) | SMEs and private landlords | Housing associations and companies with a large housing stock |
|---|---|---|
| Funding allocated upon receipt of the application (first come, first served) | Small and medium-sized enterprises as well as private owners of residential property and parking spaces; funding allocated on a first-come, first-served basis | Competitive procedure |
| Applications must be submitted by 10 November 2026 | Submit applications by 10 November 2026 | Submit applications by 15 October 2026 |
Applications open: 15 April 2026
Please note: Places are limited. We recommend that you contact us as soon as possible.
Applications must be submitted digitally via the funding portal of the project organiser, PwC.
Key eligibility criteria for funding:
At least 6 parking spaces, or 20 per cent of the available parking spaces, must be pre-wired (in short: 20 per cent – but never fewer than 6 parking spaces)
100 per cent of electricity generated from renewable energy sources
Start of construction following approval of the grant application
A cost estimate is a prerequisite for submitting an application
The 24-month implementation period begins with the notification
Within 9 months of the start of this period, the WEG must have formally commissioned the work
SWK is your all-round partner
We provide reliable support throughout all phases of your project. We support you right from the start and ensure smooth implementation.
Planning & Quotation
We tailor the project precisely to your property (load distribution, grid connection).
We will provide you with a quote in good time. This is a prerequisite for applying for funding.
Submission of applications
You can submit your grant application via the project management organisation PwC’s grant portal, using the cost estimate.
Installation of the charging infrastructure
Once approval has been granted, we will be your partner for all aspects of the cabling and installation of the wallboxes.
Operating your system
Do you need help with monitoring, maintaining and billing for your charging infrastructure? We’d be happy to take care of that for you on a long-term basis.