Technical Regulations for Grid Connection
In accordance with Section 19 of the Energy Industry Act (EnWG), electricity distribution network operators are obliged, taking into account the conditions for the grid connection of generation plants laid down in Section 17 EnWG, electricity distribution networks, installations of directly connected customers, interconnectors and direct lines, and to publish these on the internet.
Low-Voltage Technical Connection Regulations
- Technical Connection Regulations for Low Voltage (VDE-AR-N 4100)
- Generation plants connected to the low-voltage grid (VDE-AR-N 4105)
TAB 2019 Technische Anschlussbedingungen für den Anschluss an das Niederspannungsnetz
PDF
1.2 MB
Information zur Anwendung der TAB NS bei SWK und betriebsgeführten Gemeindewerken
PDF
610 kB
The following forms apply in this regard:
Technical Connection Regulations for Medium Voltage
- Technical Connection Regulations for Medium Voltage (VDE-AR-N 4110)
The following forms apply in this regard: